REFERENCE 2
DESIGN & DEVELOPMENT OF A MONITORING & DISCHARGE CALCULATING SYSTEM FOR THE HIGH DAM, ASWAN1 AND ASWAN2 POWER STATIONS
CLIENT:
VOITH Co. USA.
End User:
High Dam Authority
Project Description:
- Design and development of a monitoring and discharge calculating system for the High Dam, Aswan1 and Aswan2 power stations using GE Fanuc 90-30 programmable logic controller connected to 486 computer containing operating programs which facilitate monitoring of all measuring points in the power stations in an easy way.
- Design of a communication circuit between the three power stations for transmitting information and data every one minute.
Period of Implementation :
1995-1996