Projects

REFERENCE 1

COMMISSIONING AND OPERATION FOR THE COMPUTERIZED MONITORING SYSTEM OF THE WASTE WATER TREATMENT PLANT, ABU-RAWASH SITE

Sponsor:

  ABB, Susa Inc, 1993-1995.

End user:

  Waste Water Authority

Project Description:

  • Commissioning of :

-  One GE Fanuc 90-70 Programmable Logic Controller with three Genius Bus Controllers.

-  Two IBM 386 compatible PC’s with GE Fanuc PCIM modules interfaced with Genius distributed I/O blocks.

  • Power TRAK blocks.
  • Three GE Fanuc Genius LAN.
  • Pan alarm Mosaic-tile Mimic board.
  • Factory link supervisory control and monitoring application software.
  • Ladder program installed on the PLC system.
  • Performing necessary modifications on the originally designed computerized monitoring system to fulfill the end user requirements.
  • Training for the proper operation of the system.

Period of Implementation:

  1993-1995