REFERENCE 42
PROJECT MANAGEMENT FOR THE CONSTRUCTION OF A SOYBEAN OIL EXTRACTION PLANT (500 T/DAY) AND REFINERY (100 T/DAY)
End USER:
Zeina For Food Oil Company – Wadi EL Natrun – Egypt
Project LOCATION:
Wadi EL Natrun – Egypt
Contract DESCRIPTION:
- Design of the avant-projet.
- Flow diagram and electro-mechanical process analysis
- Preparation of project documents
- Site plan
- Man power
- Execution plan
- Cash flow
- Definition civil works needed
- Definition of steel works needed
- Definition of electro mechanical works needed
- Definition of electrical works needed
- Super vision and coordination between contractors
- Preparation of maintenance plan
Period of IMPLEMENTATION:
July 2019 till Now
OTHER VARIOUS REFERENCES
- Consultant for many local and foreign companies in the areas of Electrical Engineering and Control Systems.
- Preparation of the tender document, the technical specifications and the evaluation of Quay 84 project in Alexandria port.
- Preparation of the tender document, the technical specifications and the evaluation of Quay 85 project in Alexandria port.
- Preparation of the tender document and the technical specifications for the development of the handling equipment of Damietta silo.
- Preparation of the tender document and the technical specifications for the firefighting system for Damietta silo.
- Handing over for Damietta silo’s ship unloader.
- Design and preparation of the tender document for the development of the power factor correction of Safaga silo.
- Design of flat stores and handling equipment and other projects for many foreign companies (Stolz, Gerico, Redon-Dalmon, Voith, etc…)